IDEA 66 AT LIVADIA

DSC_0005

DSC_0207_2

An IDEA 66 was delivered in December 2013 at the village Prophet Elias at Livadia .The house prefabricated at the Easy Green production line and the completion time of the construction at the site did not exceed three weeks.