Building Permit for a Prefabricated Home

Building Permit for a Prefabricated Home

Specific engineering studies at no additional cost for qualifying homes over 80 m². Terms and exclusions apply.

A Fundamental Technical and Legal Stage

A building permit is not simply an administrative formality. It establishes the approved basis on which the proposed home may be constructed.

EasyGreen coordinates the building-permit process with qualified architects and engineers who understand Greek planning requirements and the technical characteristics of prefabricated construction.

Preliminary Review

Before the permit file progresses, the available information is reviewed in relation to plot documentation, planning restrictions, permitted building area and use, topographic information, access, location-specific conditions and the technical requirements of the proposed home.

This preliminary review helps identify matters that should be investigated or resolved before submission. Final requirements are determined by the project, applicable regulations and competent authorities.

What the Process May Include

  • architectural studies
  • structural engineering studies
  • mechanical and electrical studies
  • energy-performance studies
  • topographic and site documentation
  • preparation and completion of the permit file
  • submission through the applicable procedure
  • responses to requests for additional information
  • monitoring until the relevant process is completed

The exact scope, exclusions, professional fees, authority charges and third-party costs are defined for each project.

Coordination for Clients Living Abroad

Meetings, document collection, design reviews, approvals and progress updates can generally be managed remotely. Surveys, measurements, inspections and procedures requiring local presence are carried out by the relevant professionals. Depending on the case, the owner may need to provide original documents, official signatures or appropriate authorisations.

Building-Permit Offer for Qualifying Homes over 80 m²

For qualifying homes with a main living area of more than 80 m², EasyGreen provides specific engineering studies required for the building permit at no additional cost.

The offer concerns the engineers’ fees for the basic studies and supervision specified in its terms. Common areas, basements, storage rooms, attics, lofts, semi-outdoor spaces, balconies and other auxiliary or non-main areas are not included when calculating the qualifying main living area.

Government fees, taxes and other third-party charges are not included. These include VAT, FEM and other prepaid or withheld taxes on engineers’ fees, TEE / e-Permits administrative fees, contributions and charges payable to the State, Municipality, e-EFKA or third parties, digital transaction fees, construction-inspector fees, utility-network fees and other legal charges required for the issuance, revision, update, completion, connection or final closure of the building permit.

These amounts are paid by the project owner in accordance with the legislation and applicable charges at the time.

Additional actions, approvals or studies required because of the property, its history or location are not included and are priced separately. These may include:

  • settlement of unauthorised constructions
  • stream delimitation
  • land-registry procedures
  • other special studies or approvals

Review the permit requirements for your project and see the full terms and exclusions of the building-permit offer.

LOGO
Privacy Overview

This website uses cookies so that we can provide you with the best user experience possible. Cookie information is stored in your browser and performs functions such as recognising you when you return to our website and helping our team to understand which sections of the website you find most interesting and useful.